GEOBIM S.A.C. prepared the detailed engineering of the project to expand the capacity of the Untuca Beneficiation Plant for Mina Coripuno S.A.C, a Consorcio Minero Horizonte company. The expansions developed were carried out in two Stages:
Stage 1 - From 350 TPD to 1700 TPD
Stage 2 - From 1700 TPD to 1900 TPD
Stage 1 focused on collecting field information on how it was built and developing the Detail Engineering that served as the basis for the development of the Engineering of Stage 2.