Petaquilla Mine - Penonomé, Panamá
GEOBIM S.A.C. prepared the detailed engineering of the following structures:
Tailings Dam 1
Tailings Dam 2
Tailings Dam 3
Emergency Tub
Loma Blanca Dump
The work carried out began with the collection of Geotechnical terrain information to prepare Detail Engineering of each of the mentioned structures.
The activities carried out in each structure were:
Geotechnical study
Hydrological and Hydrogeological Study
Seismic Study
Civil Design
Mechanical Design - Piping and tailings pumping system
Operation manual